IMPORTANT INFORMATION REGARDING SEPTEMBER SCHEDULING

Posted By on August 12, 2008

  08/12/08

           2008 ROAD WORK NOTICE

Each year The Sea Ranch Association applies slurry seal to approximately one-fifth of the roads in The Sea Ranch. This treatment has proven to be a cost effective method of maintaining Sea Ranch roads. Unfortunately, it requires road closures that might inconvenience you.

This year the road work is scheduled for: Monday, September 8th through Thursday, September 11th. This means that scheduling of service installations and service calls will be limited to accessible areas during that time.

September is also going to be a very busy month for Central Valley Cable plant construction. We will begin major plant construction on September 10th that may last up to 2-4 weeks. Service installations will be kept to a minimum during this time, but we will tend to outages and trouble calls as they come in.

Please refer to the list below for dates and locations of The Sea Ranch Road Work Closures:

MONDAY, SEPTEMBER 8

Ballast

Broad Reach

Halcyon (west of Hwy 1)

Leeward Road (Halcyon to north end)

Main Sail

Mizzen Mast

Forecastle

TUESDAY, SEPTEMBER 9

Buckeye

Equinox

Fish Rock

Hatchway

Helm

Leeward Road (between Helm & Halcyon)

Rock Cod

Sea Lion

Sea Stack

Windrow

WEDNESDAY, SEPTEMBER 10

Burl Tree

Del Mar Point

Klamath

Leeward Road (South Wind to Helm)

Solstice

Starboard

Tallgrass

Windsweep

Del Mar Tennis Court parking lot

THURSDAY, SEPTEMBER 11

Back Pack

Deer Trail

Foremast

Grey Whale

Heron

Leeward Road (Back Pack to South Wind)

Pelican

Sea Drift

South Wind

Tide Pool

Del Mar Center & Pool parking lots

As always, please feel free to call Central Valley Cable about your cable or internet needs, and contintinue to check back for updated information.

             

“Great Things Are Coming Your Way” 

 

 

 

About The Author

MCN is an Internet Service Provider Owned and Operated by the Mendocino Unified School District

Comments

Comments are closed.